The Mwache Multipurpose Dam in Kinango, Kwale County, is emerging as one of President William Ruto’s most transformative infrastructure projects. Now 54% complete, the dam is on track for full delivery by October 2026, marking a major milestone in Kenya’s quest for water security, irrigation, and sustainable regional growth.
Standing 84 meters high, the Roller-Compacted Concrete (RCC) gravity dam will hold 136 million cubic metres of water. Once operational, it will supply 186,000 cubic metres of clean water daily for domestic and industrial use in both Kwale and Mombasa Counties, directly benefiting more than two million residents.
President Ruto’s administration has championed the Mwache Dam as part of a broader agenda to end chronic water shortages and foster inclusive development across the Coast region. His commitment to seeing the project through has earned praise from local leaders and residents alike.

A Game-Changing Project for Mombasa and Kwale
The Mwache Dam site, located on the Mwache River in Fulugani village, 22 km west of Mombasa, is strategically positioned to boost water access in one of Kenya’s most water-stressed regions. Identified under the Coast Water Supply Master Plan, the project has been deemed a sustainable and essential long-term option for coastal water supply and agricultural growth.
The dam will not only deliver potable water but will also support the irrigation of 2,000 hectares of farmland adjacent to the site. According to engineers, the design includes intake works, a water treatment plant, and terminal storage tanks to ensure a reliable and efficient distribution network.
Under Ruto’s leadership, the project is being executed through a comprehensive approach that includes:
- Reviewing and updating previous engineering designs.
- Conducting additional geotechnical investigations and environmental studies.
- Supervising construction and ensuring compliance with environmental and social management standards.
- Overseeing tendering, quality assurance, and contract administration to maintain transparency.

Presidential Leadership and International Collaboration
The multi-billion-shilling project was officially launched by President William Ruto, who reaffirmed his government’s commitment to prioritizing water and agricultural infrastructure. The dam is being built by Sino Hydro Corporation and Engineering of China, which was awarded a 54-month contract to complete construction.
Ruto described the project as a cornerstone of his government’s Water Security and Climate Resilience Program (Phase II), emphasizing its potential to catalyze industrial growth, create jobs, and ensure food security in the coastal region.
“This project is not just about water; it’s about transforming livelihoods, boosting agriculture, and securing the future of our people,” President Ruto said during the inspection tour.
County Leaders Applaud National Government Efforts
Kwale Governor Fatuma Achani hailed the Mwache Dam as a “game-changer” that will revolutionize the local economy. She noted that the dam would enable 6,300 acres of land to be placed under irrigation, improving agricultural productivity and food availability.
“The dam project fits into our vision of becoming a water-secured county where every resident has access to clean, adequate, and affordable water,” Governor Achani stated. She praised President Ruto’s administration for fast-tracking a project that had faced decades of delays since its proposal by the Coast Development Authority in 1995.
She further highlighted the importance of collaboration between public and private stakeholders in sustaining water gains and improving rural infrastructure.
Socio-Economic Impact for the Coastal Region
The Mwache Multipurpose Development Project will play a pivotal role in tackling the Coast region’s persistent water scarcity, unlocking irrigation potential, and improving both urban and rural livelihoods. By harnessing floodwaters from the Mwache River basin, the dam will reduce seasonal water shortages and provide consistent access for households, farmers, and industries.
Once completed, the project is expected to:
- Support food security through irrigation and climate-resilient agriculture.
- Enhance industrial productivity in Mombasa’s growing manufacturing sector.
- Create thousands of jobs during and after construction.
- Strengthen regional economic integration by linking Mombasa and Kwale through shared water resources.
A Testament to President Ruto’s Development Agenda
The Mwache Multipurpose Dam reflects President Ruto’s focus on transformative infrastructure as a driver of inclusive growth. His leadership has reignited stalled national projects and emphasized partnerships that ensure long-term sustainability.
By delivering clean water, promoting food security, and improving livelihoods for millions at the Coast, the Mwache Dam stands as a testament to visionary governance and national development under Ruto’s administration — a lifeline that will forever change the face of Kenya’s coastal region.



