Severin Sea Lodge Triad were commissioned by Severin Sea Lodge to carry out full refurbishment of one hundred rooms and construct new kitchens and conference facility in the centre of the hotel. This involved critical project management as the hotel was still in operation during refurbishment. An extremely tight budget was set.
Triad worked closely with the hotel project team to develop designs, select materials and control the construction process. A tight programme was essential to meet the tourist high season and Triad allocated staff to the site to ensure the contractor was not held up for lack of information and so that design decisions could be made quickly on site.
Project targets were achieved, cost targets were met and the hotel opened on time.
Client: Severin Group
Project Location: Mombasa, Kenya
Gross Area:9000sq. metres
Completion : 1987
Project Partner: Tim Vaulkhard
Project Architect: Shan Khan
Make sure to check out our social media to keep track of the latest content.
Instagram - @nyongesasande
Twitter - @nyongesasande
Facebook - Nyongesa Sande
YouTube - @nyongesasande
Disclaimer: The information that Nyongesasande.com provides on this website is obtained from publicly available resources and is intended for information or educational purposes only. We aim to present the most accurate information possible. Through this website, you might link to other websites which are not under our control. We have no control over the nature, content and availability of those websites. Inclusion of any links does not necessarily imply a recommendation or endorsement of the views expressed within them. All content on this website is copyright to the website’s owner and all rights are reserved. We take no responsibility for, and will not be liable for, the website being temporarily unavailable due to technical issues beyond our control. Please refer to our terms and conditions and privacy policy before using this website.