Rwenzori House model. Triad has carried out the design and feasibility study in collaboration with Mentor Management of the D.F.C.U. investment project on Lumumba Avenue Kampala.
This study has demonstrated the speed and effi ciency of the CADD system employed in Triad’s offi ces, allowing for 12 different design alternatives to be fully developed and costed during the feasibility stage, enabling the investors to carry out complex and comprehensive pre-investment feasibility studies.
Client:DFCU
Project Location: Kampala, Uganda
December 16, 2015
Project Partner: Tim Vaulkhard / J. Gitoho
Project Architect:Paul Davey
Make sure to check out our social media to keep track of the latest content.
Instagram - @nyongesasande
Twitter - @nyongesasande
Facebook - Nyongesa Sande
YouTube - @nyongesasande
Disclaimer: The information that Nyongesasande.com provides on this website is obtained from publicly available resources and is intended for information or educational purposes only. We aim to present the most accurate information possible. Through this website, you might link to other websites which are not under our control. We have no control over the nature, content and availability of those websites. Inclusion of any links does not necessarily imply a recommendation or endorsement of the views expressed within them. All content on this website is copyright to the website’s owner and all rights are reserved. We take no responsibility for, and will not be liable for, the website being temporarily unavailable due to technical issues beyond our control. Please refer to our terms and conditions and privacy policy before using this website.